beautypg.com

Cold start boiler application - priority figure 4 – Slant/Fin HWT-120 User Manual

Page 11

background image

11

INDIRECT FIRED WATER TANK

V WIRING (cont’d)

COLD START BOILER APPLICATION - PRIORITY FIGURE 4

POWER

INPUT

ZONE 1

ZC

X

X

END SWITCH

ZR

120 VOLT CIRCULATORS

SIX ZONE SWITCHING RELAY

WITH OPTIONAL PRIORITY

THERMOSTAT

ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6

ZONE 1

ZONE 1

POWER

ZONE 2

ZONE 3

ZONE 4

ZONE 5

ZONE 6

JUMPER

TO: "TT" ON BOILER

24 VAC

POWER

FUSE 1 AMP

120 V RELAY

ZONE 6

PRIORITY

SR 506

ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6

ON

OFF

T

TACO SR504 & SR506

SWITCHING RELAYS

120 VAC OUTPUT

I

INDIRECT TANK
TEMP CONTROL

I

INDIRECT

TANK

CIRCULATOR

Operation: When any thermostat calls for heat, the
appropriate circulator is energized and the isolated

end switch (X and X) will start the boiler.

Priority Operation: When zone 6 is switched to
the priority setting and is actuated, all other zones

will stop operation until zone 6 is satisfied. When

zone 6 is not switched to priority, all zones will oper-

ate independently.

Jumper Placement: The jumper should be placed
between terminals ZC and ZR. Connect the

isolated end switch to the aquastat control on the

boiler.

Power Input: Connect 120 volt as power input to
terminals N and H. Neutral wire to terminal N. Hot

wire to terminal H.

This manual is related to the following products: