beautypg.com

SeaLand 4400 Series Toilet Installation User Manual

Page 7

background image

7

Dometic 4300/4400 Series Toilets

Installation

7 . Insert floor flange into larger hole and secure to the floor with #12x3/4-inch long flat head wood

or sheet metal screws (fig .

9

) .

8 . Route 1/2-inch (13 mm) PEX tubing through the smaller hole and install a PEX 1/2-inch NPT

fitting (fig .

10

) .

Note
A water shut-off valve should be installed in the water line to the toilet for maintenance
requirements .

9 . WITH THE ELECTRICAL POWER OFF, route #14 gauge stranded copper wire from 12 VDC

ground and positive 12 VDC from the fuse panel through a 2-amp fuse or circuit breaker . Leave
at least 12 inches (305 mm) of wire for connecting to toilet (fig .

11

) .

Below-Floor Installation

Above-Floor Installation

9

10

11

10 . Connect the holding tank to the bottom of the discharge flange .
11 . Slide four T-bolts into the slots of floor flange . Install the flange gasket over the T-bolts (fig .

12

) .

12 . Install floor flange adapter with words “THIS SIDE UP” facing up . Tighten adapter to floor flange

using four flat washers and hex nuts . Tighten in criss-cross pattern (fig .

13

) .

12

13

This manual is related to the following products: