Installation, 6 installation – SeaLand DVS02 Vacuum Status Control User Manual
Page 7

7
5.3 Dimensions
(fig.
2
, page 2)
Ref.
Dimension
A
83 mm / 3 .25 in .
B
83 mm / 3 .25 in .
C
51 mm / 2 in . clearance behind wall
D
10 mm / 0.38 in.
5.4 Approvals
ISO 8846; EMC Directive 2004/108/EC; CE approved for electromagnetic compatibility
6 Installation
6.1
Vacuum status control panel
(fig.
1
A, page 2)
Caution! 
Do	not	install	DVS02	panel	in	area	with	potentially	flammable	or	explosive	vapors.
1 . Select panel location away from direct contact with water
and oil .
2 . Confirm clearance for wire connections behind wall, hull
liner or bulkhead .
3. Using control panel template (fig.
4
, p . 3), cut out panel
access hole (E, F) and drill fastener holes (G).
4. With electrical power off, route 14-gauge stranded copper
wire	(or	other	wire	according	to	ABYC	standards)	from	
power source to panel location . Route additional wire 
according	to	appropriate	wiring	diagram	(fig.	
5
-
7
,
pp . 8 - 9 – wiring diagram schematics), depending on your 
application, to panel location . Make sure wires extend out 
through access hole .
5 . Make proper wiring connections to wires extending from
bottom of circuit housing (fig.
1
4, p . 2) .
6. Remove panel cover (fig.
1
1, p . 2) from circuit panel/
mounting	frame	assembly	(2,	4),	if	necessary,	by	carefully	
pulling them apart . 
7. Install mounting frame to wall with four fasteners (fig.
1
3,
p .2) .
8 . Push panel cover onto mounting frame until it locks .
9.	 Turn	on	electrical	power	to	DVS02	panel.		Turn	on	DVS02	power	switch	(fig.	
3
B, p . 2) and
confirm normal operation of status lights .
DVS02 Panel Template 
Dimensions 
(fig.
4
, page 3)
Ref.
Dimension
A
83 mm / 3 .25 in .
B
83 mm / 3 .25 in .
C
67 mm / 2 .63 in .
D
67 mm / 2 .63 in .
E
55 mm / 2 .16 in .
F
68 mm / 2 .69 in .
G
2 mm / 0.10 in. dia.
H
Cut-out area .
Allow 51 mm / 2 in .
clearance behind
wall .
Dometic Vacuum Status Control Panel
Specifications
