InStAllAtIon / PERFoRMAnCE CHECK lISt

REFRIGERAtIon SYStEM:

Was unit given 24 hr warm up period
for crankcase heaters?

YES

NO

Stage-1 Liquid Pressure (high side) ________________________

Stage-1 Suction Pressure (low side) ________________________

Has the owner’s information been

reviewed with the customer?

YES

NO

Has the Literature Package been left

with the unit?

YES

NO

InStAllAtIon ADDRESS:

City _________________________ State _________________

Unit Model # __________________________________________

Unit Serial # __________________________________________

Unit Installed Minimum clearances per
Figure 1 (page 4)?

YES

NO

InStAllER nAME:

City ________________________

State _________________

709093C (Replaces 709093B)

ElECtRICAl SYStEM:

Electrical connections tight?

YES

NO

Line voltage polarity correct?

YES

NO

Rated Voltage: ___________________________________ VOLTS

L1-L2 Volts: _____________________________________ VOLTS

L1-L3 Volts: _____________________________________ VOLTS

L2-L3 Volts: _____________________________________ VOLTS

Avg. Volts: ______________________________________ VOLTS

Max. deviation of voltage
from avg. volts: ___________________________________ VOLTS

% Volt imbalance: ________________________________ VOLTS

Blower Motor HP: ________ Sheave Setting ___________# Turns

Has the thermostat been calibrated?

YES

NO

Is the thermostat level?

YES

NO

Is the heat anticipator setting correct?
(If Applicable)

YES

NO