Installation / performance check list – Reznor S5BP Unit Installation Manual User Manual
Page 16

Specifications & illustrations subject to change without notice or incurring obligations.
O'Fallon, MO | Printed in U.S.A. (11/11)
InStAllAtIon / PERFoRMAnCE CHECK lISt
REFRIGERAtIon SYStEM:
Was unit given 24 hr warm up period
for crankcase heaters?
YES
NO
Stage-1 Liquid Pressure (high side) ________________________
Stage-1 Suction Pressure (low side) ________________________
Has the owner’s information been
reviewed with the customer?
YES
NO
Has the Literature Package been left
with the unit?
YES
NO
InStAllAtIon ADDRESS:
City _________________________ State _________________
Unit Model # __________________________________________
Unit Serial # __________________________________________
Unit Installed Minimum clearances per
Figure 1 (page 4)?
YES
NO
InStAllER nAME:
City ________________________
State _________________
709093C (Replaces 709093B)
ElECtRICAl SYStEM:
Electrical connections tight?
YES
NO
Line voltage polarity correct?
YES
NO
Rated Voltage: ___________________________________ VOLTS
L1-L2 Volts: _____________________________________ VOLTS
L1-L3 Volts: _____________________________________ VOLTS
L2-L3 Volts: _____________________________________ VOLTS
Avg. Volts: ______________________________________ VOLTS
Max. deviation of voltage
from avg. volts: ___________________________________ VOLTS
% Volt imbalance: ________________________________ VOLTS
Blower Motor HP: ________ Sheave Setting ___________# Turns
Has the thermostat been calibrated?
YES
NO
Is the thermostat level?
YES
NO
Is the heat anticipator setting correct?
(If Applicable)
YES
NO