OmniSistem Q Scan User Manual
Page 32
IBM 25 PIN female
QSCAN MALE
9 pin
3..RECEIVE---<----red-----------<---------XMIT 3
2..SEND------>-------yel-------->---------REC 2
7..COMMON----><---------wht-----><--------GND 5
4..\
+12
6 KEYPAD POWER
5.. \ TIE TOGETHER (NULL MODEM) -12
7 KEYPAD POWER
6.. /
20./
THE PARALLEL CABLE IS A STANDARD 25 PIN STRAIGHT THROUGH MALE/MALE D-SUB.
MOUNTING
The mounting of the Q-Scan onto the Q-Beam will require the following parts provided with your Q-Scan and
comes inside the Q-Scan packaging: 4,5,6
Yoke extenders are necessary to provide clearance for the Q-Scan head for installations using the yoke in
the top mount position.
ALIGNMENT
Precise alignment of the port 10 that will project the beam into the Q-Scan has to be done prior to use. An
alignment tool has been provided to make this process simple. Follow the steps below to align the Q-Beam
to the Q-Scan.
• Step one – Remove the beam modules on ports 8,9,10
• Step two – Press Enter on the Back of the Q-Beam
• Step Three – Press Test Align on the Back of the Q-Beam
• Step Four – Press Up until the beam comes out of Port 10
• Step Five – Place Q-Scan Adjustment Tube in the module clamp of port 10 and tighten to finger tight
• Step Six – Remove the two black caps on the opposite side of the top rail of the Q-Beam. (Not the
two on the end of the projector). These are for the Red adjustment. The right ones is near the Red
LED on the top rail.
• Step Seven – Using a flat head screw driver adjust the beam so that it hits the exact center of the
centering mark on the top of the Q-Scan Alignment Tool as Illustrated below.
• Step Eight – Remove alignment tool.
• Step Nine – Place the Q-Scan into module ports 10 and 8 and tighten.