beautypg.com

NORAC UC4+BC+JD8A User Manual

Page 36

background image

32

The two free wires on C70 should

be trimmed and sealed with
heatshrink or silicone so they do

not short together or get tangled
in other components.

Figure 42: Valve Cable Connections

17. Connect S3 on cable C13 to the valve

extension cable C11.

18. Route the free end of C13 under the

sprayer to the shuttle valve manifold.
Unplug the load sense jam valve
connector (Figure 43) and plug in the
tower connector from C13. Connect
the load sense jam valve connector to
the free connector on C13.

19. Connect the Sensor Roll Bias cable

(C71) to the valve extension cable
(C11).

20. Route cable C71 to the roll sensor.

21. Connect the sensor branch cable (C02)

to the free connector on cable C71
(Figure 44).

Figure 43: Load Sense Jam Valve

Connector

22. Route the sensor branch cable (C02) to

the wing and main sensors. Follow
existing cables and/or hydraulic lines
along the boom.

Route the main lift cable through

the main lift mounting bracket
tube to provide additional cable

protection

23. Cable-tie the installed cables every 12

inches.

IMPORTANT:

Provide enough slack in all cables to
account for the movement of the
main section, parallel lift, and
FOLDING boom movement.

Figure 44: Cable Configurations: C11, C71 and C02

Connector

Location

Connector