beautypg.com

NORAC UC4+BC+JD8A User Manual

Page 35

background image

31

Figure 40: Alternate Cab Exit for

Cabling

8. Attach the valve extension cable (C11)

to C10 (Figure 38).

9. Route the valve extension cable (C11)

to the rear of the sprayer near the
sprayer valve block. Run the cable along
the sprayer frame with the JD harness.

10. Connect the variable rate valve cable

(C03) to the valve extension cable
(C11) (Figure 41).

11. Install the 2-pin connectors from C03

onto each NORAC valve as shown in
Figure 42. The connectors are marked
RIGHT UP, LEFT UP, RIGHT
DOWN
and LEFT DOWN. Cables
labeled with UP go on the same side as
the hydraulic hoses.

Figure 41: Cable Configurations: C70, C17, C11, C13 and C03

12. Connect the six pin shroud (T6B) on

cable C17 to the mating tower on the
valve extension cable (C11).

13. Connect the three pin tower (T3) on

cable C17 to the mating tower on the

valve extension cable (C11).

One connector on C17 will

remain disconnected. It is used
when installing other UC4+
options.

14. Install the two 2-pin connectors on the

end of cable C17 to the 3

rd

station of

the block.

The connector marked “Main

Up” goes on the same side of the
block as the hoses.

15. Connect the roll control cable (C70) to

S3 on cable C17.

16. Install the 2-pin connectors from C70

onto the expansion block with the
connector labeled Roll CW on the
same side of the block as the hoses.

Cab Exit