beautypg.com

6 target installation and alignment – NORAC UC4+BC+JD8A User Manual

Page 20

background image

16

4.6 T

ARGET

I

NSTALLATION AND

A

LIGNMENT

NOTE: It is very important that the
rods be installed on the right hand
side of the sprayer.

The sprayer must be level when

installing the UC4+ Roll Control
System. The sprayer booms
should be level as well, parallel to
the sprayer’s lift frame.

1. To ease the installation of the UC4+

Roll Control system, unfold the sprayer
on a level area and lower the center
section to three or four feet above the
ground. A ladder or step will also be
required to complete the installation.

Figure 15: Roll Control Items

Figure 16: Typical Roll Control Install

Bumper

Frame

Target

Roll

Control

Frame

Sprayer Parallel Lift
Frame

Sensor
Bracket

Roll
Sensor

Spring
Target

Boom Centre
Frame

Remove the Rubber

Bumper

Sensor Bracket (B14)

Spring Target (B12)

Frame Target (B09)