Mpg107 instructions #1, Malone – Malone MPG107MD User Manual
Page 2
MALONE
R
Installation & Loading Instructions - MPG107M (MD) SeaWing
5
. Confirm the carriers are in alignment.
Firmly tighten the T-knobs until both
carriers are securely fixed to the cross
bars. See image 5.
. Insert a second Mounting Bolt into the top side
unused carrier hex hole and down through the
Jawz mounting adapter. Apply a second T-knob
and slightly tighten until the carrier is secure.
Repeat steps 1-4 for the 2nd carrier and rear
cross bar. See image 4.
. Insert the four Rubber Plugs into the four top side
hex holes in the two carriers. See image 6.
Step 2: Loading the Kayak
. Route the free end of a 12’ Load Strap down
through the top of the outer most strap slot
and back up through the inside slot of the
carrier. Pull the free end until there is an
even loop. Repeat for the second carrier.
See image 7.
TM
6
4
7