beautypg.com

Mpg115md instructions #2, Malone – Malone MPG115MD User Manual

Page 3

background image

MALONE

R

8

10

. Apply a t-knob to the bolt and slightly

tighten until the carrier is secure on

the cross bar. Repeat for the second

carrier and rear cross bar. See image 9.

. Insert a mounting bolt into the rear side

hex hole and down through the Jawz

mounting adapter. See image 8.

Step 3: Loading the Kayaks

. Route the free end of a 12’ load strap

through one strap slot in the top of the

carrier. Pull the free end back until

there is an even loop. Repeat for the

second carrier. See image 11.

11

9

Installation & Loading Instructions - MPG115MD Stax Pro2

TM

. Raise the carriers to the up-position and

confirm alignment. Tighten the t-knobs

until both carriers are securely fixed to the

cross bars. Place foam blocks onto the cross

bars and next to the carriers. See image 10.

Note: When transporting one kayak; the

carriers should be positioned so that the

distance from the carriers to the cross bar

towers is exactly the width of the kayak.