KERN & SOHN AEJ 100-4NM User Manual
Page 67
AEJ_N/AES_N-BA-e-1321
67
13.6.2 Carry out series of measurements for test volume V
0
After entering all parameters (See chap. 13.6.1), position the weighing vessel,
wait for the stability display to appear, then tare by pressing the TARE-key; P1
V
0
will appear, followed by Place 1.
1.
Dispense the test fluid (such as distilled water) into the weighing vessel of
conduit “V
0
”.
2.
Wait for stability display, then press the PRINT button. Place 2 followed by
the current weight display will appear.
3.
Tare, by pressing the TARE-key.
Repeat this test cycle (steps 1 -3) as often as set in “Set n”
(see chap. 13.6.1).
After the last test cycle has been confirmed, a display announcing the start of
the second series of measurements “P2 V
1/2
”, followed by Place 1, see chap.
13.6.3, will appear.