beautypg.com

0 inserting pcbs, Eight-door concentrator, Kdc-8 quick s tart guide – Keri Systems Eight-Door Concentrator User Manual

Page 21

background image

Eight-Door Concentrator

2305 Bering Drive

01959-001 Rev. 1.1

San Jose, CA 95131 USA
(800) 260-5265 (408) 435-8400 FAX (408) 577-1792
Web: http://www.kerisys.com E-mail: [email protected]

Page 21 of 24

KDC-8

Quick S

tart Guide

4.0

Inserting PCBs

The concentrator backplane is now ready for the four controllers/satellite boards. To insert a
controller into the backplane, carefully align the connectors on the controller with the plugs on the
backplane and slide the controller into place. It will be a firm, snug connection.

Once all four controllers are installed, connect the four Reader Jumper cables (provided with the
cabinet). These cables connect the B-Reader on the controller to the backplane.

Next, connect the TB10 Relay Jumper cables (provided with the cabinet). These cables connect
TB10 on the satellite board to the backplane.

Figure 27: B-Reader and TB10 Backplane Connection Locations