beautypg.com

Fleet Engineers INS-02025 User Manual

Single bolt mount installation instructions

background image

Installation Sheet #INS-02025
7/02 • Rev. B-10/06

Each Single Bolt Mounting
Package Set Includes:

•2 mount sockets
•2 5/8” bolts
•2 lock washers

NOTE: These instructions for installation are intended to be a

general guide to help the installer. Because of the large number of

possible mounting configurations, the installer is responsible for

the ultimate installation design. Any modifications to the product

are at the discretion, responsibility and risk of the installer.

1. Determine the mounting position for the mudflap bracket. If

there is not an existing clearance hole for a 5/8” bolt available,

one will have to be drilled.

front view

back view

90

NOTE: Be sure to follow

truck manufacturers rec-

ommended procedures

for drilling any required

hole in the frame.

2.

IMPORTANT! Make sure the

frame is clean and free from

obstructions and excessive

thickness of paint.

Loosely attach the mount to the

frame with the 5/8” bolt.

3. Insert the mud flap

bracket into the

opening on the top

of the mount. Make

sure the mud flap

hangs vertical to the

road.

4. Tighten the bolt to

245 ft. lbs. of torque

while keeping the

mud flap in the verti-

cal position.

mud flap and mud flap bracket
not included

Single Bolt Mount

Installation Instructions

Patent #6,484,984B2

Installation Sheet #INS-02025