D.A.S. Audio Aero 48 User Manual
Page 9
Lift the box and introduce the
G1A48 guides securing them
with the safety pins.
Once the boxes have been joined, the front
dolly panels can be removed. The next boxes should
be attached “one by one” using the methods
described. Finally, the array should be hoisted to the
correct height and secured with slings to avoid
swinging.
This method is more time consuming than
assembling an array by the “all at once” procedure,
but is appropriate for situations due to a lack of space
in which to array the system. During the process, the
safety pins should be checked making sure they are
secured correctly. Once the complete array has been
lifted into place, additional slings should be attached
to secure the array and avoid swinging.
3.4 ASSEMBLING AN ARRAY USING
THE PL-48 PLATFORM
The PL-48 platform can be used to easily
transport AERO-48 units to the assembling area. To
use this method of assembling and hoisting the array,
there must be enough space to permit linking all the
boxes from the front of the the rigging hardware.
The first step will be to attach the AX-
AERO48 grid and the 2 hoists. Once this has been
accomplished, the grid structure can be placed in a
vertical position by lifting the rear hoist and lowering
the front hoist so that the rear of the grid is on top and
the front of the grid at the bottom, ready to receive the
first box.
Rigging points
The next step is to attach the first unit to the
grid by introducing the G1A48 and G2A48 guides in
the receiving points of the grid structure and assuring
them with the (6) safety pins. The safety pins should
be inserted in the slot of the G2A48. It is very
important to make sure that the pins have been
inserted and locked correctly.
AX-AERO48
AERO-48
G1A48
G2A48
1
2
3
4
5
6
3 + 4
36
Aero-48
Manual del usuario/ User´s manual