D.A.S. Audio Aero 48 User Manual
Page 15
Continue lowering the systems and secure
(16) the PL-48S_1 pieces to the front rigging points of
box 3, inserting 2 safety pins in each (17).
The next step is to roll under the remaining
boxes, an empty
PL-48S and lower the boxes until
they are within close proximity of the platform. The
procedure should now be repeated, freeing the PL-
48S_2 pieces (13) from the platform, turning them
(14) and securing them (15) to the rear rigging
hardware of the number 3 box.
15
PL-48S_2
PL-48S_1
14
17
13
16
Whenever a safety pin is inserted, it is
recommended that they be checked to make sure that
they are correctly attached. Pull the safety pin
outward to make sure that it is in the locked position.
As in the case of the first group of boxes, it is
not necessary to remove the safety pins securing the
G2A48 guides which determine splay angle. They can
remain in as they are, ready for the next event. The
same goes for the AX-AERO48 grid.
18
The last step consists of lowering the
remaining array so that the safety pins can be inserted
(18) into the holes of the PL-48S_1 pieces and the
platform.
B) Stacked units (MAX. 4 units):
Besides using the PL-48S platform for
transporting and flying the systems, it can also be
used for ground stacking.
In the event that 4 boxes are
used, they should be arranged so that the splay angles
do not make the platform unstable. Once the boxes
are flown, they can be lowered onto the PL-48S
platform by using the hoists to position the array so
that the
The PL-48S_2 piece on the platform has 2
holes, the lower one offers a 0º angle between box
and platform and the upper hole offers a 1.6º angle,
meaning that the box is leaning forward.
Due to the weight of the
boxes, it is recommended that they be flown first and
then lowered to the platform and
stacked. For
stability reasons, it is recommended that no more
than 4 boxes be stacked.
safety pins can be inserted into the G2A48
guides.
42
Aero-48
Manual del usuario/ User´s manual