2 listing capacity release by manager intervention, Listing capacity release by manager intervention – Toshiba TEC MA-1400-100 User Manual
Page 54
Attention! The text in this document has been recognized automatically. To view the original document, you can use the "Original mode".
EOl-11014
Table 1 : KEYS AND MANAGER INTERVENTION STATUS
Key
Manager ntervention
Reference
Not Required
Required
[RTN MDSE]
Ask your TEC representative
as to information or changes
of KEY STATUSES.
[PO]
1-1
[%-] (or % I , %II)
[EX]
[ALL VOID]
[VND CPN]
[STR CPN]
Table 2 : OPERATIONS AND MANAGER INTER'
MENTION STATUS
Key
Manager Intervention
Not Required
Required
Negative Balance
Sales finalization by
Media Keys (except
[AT/TL])
Negative Department
or negative PLU
entries.
Reference
Ask your TEC representative
as to information or changes
of PROGRAM OPTIONS.
1.2 LISTING CAPACITY RELEASE BY MANAGER INTERVENTION
Listing Capacities (LC) may be programmed on Departments/PLUs, Tender Medias. These LC’s are
programmed to check an excessively high amount entry by operator’s mistake at the earliest stage.
The procedure of operators and Manager Intervention for LC release is same as described in 1.1.
- 2 -