INITIAL START-UP

4-5

22. Once the oxygen level is within the specified

range at 70%, lower the firing rate to 50%
and select VFD parameter 64. The oxygen
level at the 50% firing rate should be as
shown below.

Combustion Oxygen Level at

50% Firing Rate

Oxygen %

± 0.2

Carbon

Monoxide

NOx

7.0 %

<50 ppm

<20 ppm

23. Adjust the oxygen level as necessary to

obtain the required reading at the 50% firing
rate.

24. Once the oxygen level is within the specified

range at 50%, lower the firing rate to 40%
and select VFD parameter 63. The oxygen
level at the 40% firing rate should be as
shown below.

Combustion Oxygen Level at

40% Firing Rate

Oxygen %

± 0.2

Carbon

Monoxide

NOx

7.8%

<50 ppm

<20 ppm

25. Adjust the oxygen level as necessary to

obtain the required reading at the 40% firing
rate.

26. Next, set the firing rate to 30% and select

VFD parameter 62. The oxygen level at the
30% firing rate should be as shown below.

Combustion Oxygen Level at

30% Firing Rate

Oxygen %

± 0.2

Carbon

Monoxide

NOx

8.0 %

<50 ppm

<20 ppm

27. Adjust the oxygen level as necessary to

obtain the required reading at the 30% firing
rate.

28. Finally, reduce the firing rate to 14% and

select VFD parameter 61. The oxygen level
at the 14% firing rate should be as shown in
the following tabular listing:

NOTE

At a 14% fire rate, if parameter 61 is
above 326, the VFD software will use 326
by default. 326 corresponds to a
frequency of 32.6 Hz.

Combustion Oxygen Level at

14% Firing Rate

Oxygen %

± 0.2

Carbon

Monoxide

NOx

8.5 %

<50 ppm

<20 ppm

29. Adjust the oxygen level as necessary to

obtain the required reading at the 14% firing
rate.

30. This completes the combustion calibration

procedures.

4.4 UNIT REASSEMBLY

Once the combustion calibration adjustments
are properly set, the unit can be reassembled for
service operation.

1. Set the ON/OFF switch in the OFF position.

2. Disconnect AC power from the unit.

3. Shut off the gas supply to the unit.

4. Remove the manometer and barbed fittings

and reinstall the NPT plug using a suitable
pipe thread compound.

5. Remove the combustion analyzer probe

from the vent hole. Replace the NPT plug in
the vent hole using a suitable pipe joint
compound.

6. Replace the unit’s side panels and front

door.