Getting started, Unpack and inspect, Table 4 — packing list (tesc system) – Cannon Instrument TESC User Manual
Page 13: Tesc operator's manual, rev 1.0
7
CANNON®
TESC Operator's Manual, Rev 1.0
Getting Started
Unpack and inspect
Unpack and inspect the complete CANNON® Thermoelectric Sample Conditioner System and
all accessories as soon as they are received.
Caution:
Many components are fragile. Use caution when moving and
handling the TESC System and accessories.
1. Carefully unpack the entire contents of the shipment.
2. Referring to the packaging list, verify that all materials were received.
3. Inspect materials for defects and shipping damage. Contact your CANNON®
representative to resolve any issues.
Table 4 — Packing list (TESC System)
Description
Part Number
TESC base unit
17.5075
Mounting collar
17.5113
Retaining ring
17.5114
Retaining screws (4)
01.0063
MAINS AC power cable
74.2110 (US standard)
MAINS AC pass-through power cable
17.4168
RS-485 to USB cable
17.5122
Brookfield® DV2T viscometer
115 V
AC
: 17.5126; 230 V
AC
:
17.5127
Brookfield® #4B2 insulated spindle
17.5128
Brookfield® EZ-Lock spindle coupling
17.5129