Installation, Shipping and packaging – Steffes 9180 User Manual
Page 11

installation
3
SHiPPinG anD PackaGinG
The ThermElect Hydronic system should always be transported in an upright position to avoid damage to internal
components and insulation materials. The information below describes the items shipped with each system.
1
STORagE MOdULE
MOdEL INPUT
9150
53kW
9180
80kW
INSTaLLaTION HaRdWaRE KIT
(shipped
inside the
electrical
panel)
7
HEaTINg ELEMENTS
WITH CERaMIC INSULaTORS
6
INFORMaTION PaCKagE
(includes Owner's Manual and Warranty Registration Card)
(included on pallet with the electrical panel )
5
ELECTRICaL PaNEL
3
MOdEL
ELEMENTS
9150
12 (2 boxes of 6)
9180
18 (3 boxes of 6)
(shipped separately)
(includes electrical
panel mounting
screws, romex con-
nectors, and wiring
schematic)
4
PRESSURE RELIEF VaLVE
(shipped behind the
exchanger access
panel)
Refer to Page 3.09
208/240V shown
SEaM TRIM
(shipped inside brick
storage module)
8
2
BaSE
installa
tion
T
herm
e
lecT
h
ydronic
i
nSTallaTion
3.01