Installation Tasks
Installing a rack kit involves performing the following tasks in their numbered order:
Removing the rack doors
Marking the rack
Installing the rail assemblies in the rack:
•
RapidRails installation
•
VersaRails installation
Installing the system in the rack
Installing the cable-management arm
Routing cables
Replacing the rack doors
Recommended Tools and Supplies
•
A #2 Phillips screwdriver
•
A T-10 Torx driver (if installing the tower-to-rack kit)
•
Masking tape or a felt-tip pen, for use in marking the mounting holes to be used
•
A measuring ruler or tape measure
RapidRails Rack Kit Contents
The RapidRails rack kit includes the following items (see Figure 1-1):
•
One pair of RapidRails slide assemblies
•
One cable-management arm
•
One cable tray
•
Four 6-32 x 0.25-inch hex-head Phillips screws