Inspection and start-up checklists, Receiving and inspecting, Handling and installing – Wine Guardian Ducted Wine Cellar Cooling System (D0200) - Manual User Manual
Page 45: Starting-up the unit, Unit mounted on solid level surface, Proper electrical service provided, Hot water provided to humidifier, Drain lines and trap installed properly, Ductwork, fittings and grilles installed properly, All cold duct surfaces insulated

45
Inspection and Start-up Checklists
Receiving and Inspecting
Unit received undamaged
Unit received complete as ordered including accessories
Handling and Installing
Unit mounted on solid level surface
Sufficient space allowed for access to unit and accessories.
Proper electrical service
provided
Hot water provided to humidifier
Drain lines and trap installed properly
Ductwork, fittings and grilles installed properly
All cold duct surfaces insulated
Low ambient control included if freezing condition present.
No obstructions to air
flow to condenser
Starting-up the Unit
General visual inspection looks good.
All wiring connections checked
All ducts, grilles and panels in place
Start unit
Check ducts and connections for air leaks
Balance air distribution
Confirm condenser airflow is unrestricted
Verify cooling and heating operation
Check for excessive noise or vibration