2.1
Installation Overview
Standard installation consists of the following steps:
1. Select a site
2. Check for levelness and smoothness of site
3. Unpack weigh pads and ramps
4. Attach ramps to weigh pads
5. Connect cables
6. Calibrate unit
2.2
Site Preparation
Careful consideration must be taken when preparing a site to install the Rice Lake AX3040.
Important
Note
The scale must be placed on a flat and level hard surface. The material should be equal to or better than
3000 psi. concrete.
•
Never load the weigh pads beyond capacity.
•
Avoid areas where the weigh pads could receive damaging side impacts or shock damage.
•
Avoid areas where water may damage pads, which are not meant for washdown environment.
•
The site should have a level grade for the approach and exit.
•
If the Rice Lake AX3040 is not on level ground, errors can occur due to weight being transferred toward
and away from the weigh pads (due to unlevel grade). Also friction in the vehicle’s suspension system can
draw the weight off the axle being weighed - especially if the brakes are applied.
•
Ensure the area is clear of rocks and debris.
•
All cables must be protected against crushing and/or cutting, or moisture.
2.3
Unpacking the AX3040
Remove all packing material that surrounds the scale and inspect it for visible damage caused during shipment. If
any parts were damaged in shipment, notify Rice Lake Weighing Systems and the shipper immediately.
Homerun cable, manual,
and 4 lifting eyebolts
taped to weighbridge
Shipping method may
vary, typical is shown.
Note
Figure 2-1. Packaging Kit