Series 5900 Silicone Structural Glazed Curtain Wall Installation

*

DIMENSION CHECK

OVERALL

EVERY 5 UNITS

DIMENSION CHECK

Section IV: Frame Assembly


Frame Assembly – Captured Horizontals

A.)

Assemble shear blocks, splices, anchors, etc., to mullions as required.

B.)

Install and anchor vertical mullions to form the vertical sections per “APPROVED”
shop drawings
















Interior horizontals are

cut D.L.O. – 1/32”. The

erector is to split the

difference on both sides.

Rotate the horizontal over the shear

block from the interior of the

system. With the horizontal in

position, fasten with (1) #10-16 X
1” PLFH Tek3 screw on each end of

horizontal, and tighten as required.

#10-16 X 1”

PLFH Tek3

Filler

1” Minimum

Apply sealant to the

face and top of the

shear block as shown.

¼” X 1 ½” HWHSMS

Note: The commercial cut to length tolerance is +- 1/16”.

It is critical to check every 5

th

“UNIT” for location.

Note: Check overall frame

dimensions on every 5
openings on long runs to
avoid dimensional build-up.

Insert front edge of filler into front

race in horizontal. Rotate trailing

edge up and engage into snap.