beautypg.com

EFCO S5900 Structural Glazed User Manual

Page 6

background image

EFCO CORPORATION 6/2012 PART NO. Y354

Page 6 of 23

Series 5900 Silicone Structural Glazed Curtain Wall Installation

Section II: Perimeter Application

Optional Perimeter Mullions






Optional Perimeter Head Mullion





Optional Perimeter Jamb Mullion

Optional Perimeter Sill Mullion





Note: The caulking must

overlap the metal to
metal joint at the
critical seal line.

Set adaptors

in sealant

typical.

Note:

Setting
chair
must be
rolled into
position
before
glazing
adaptors.

CRITICAL

SEAL LINE.

Primary seal

Miter adaptor

and filler at

vertical to

horizontal

intersections

and seal
watertight.

Cap seal fastener

heads with sealant.

½” Nominal
(

3/8”

Minimum)

Optional

cosmetic seal

Perimeter With Channel Adaptor Reveal