beautypg.com

X: miscellaneous applications – EFCO S5900 Structural Glazed User Manual

Page 18

background image

EFCO CORPORATION 6/2012 PART NO. Y354

Page 18 of 23

Series 5900 Silicone Structural Glazed Curtain Wall Installation

X: Miscellaneous Applications

Clean

A.)

Clean all metal and infill surfaces that will come in contact with the structural

silicone sealant with the proper cleaner.

B.)

Apply silicone primer as recommended by the silicone manufacturer.


Setting Blocks

A.)

Position and install the setting blocks per the “APPROVED” shop drawings.


Position Glazing Infill

A.)

Set the glazing infill into the framing opening tight against the interior gasket,

and position squarely onto the setting blocks.

Gaskets to Pressure Plates

A.)

Apply the glazing gasket to the pressure plates.

B.)

The gaskets applied to the vertical pressure plates are to be cut flush at both

ends, except in multi-story applications where gaskets are to extend 1” beyond
the end at expansion joints.

C.)

The gaskets applied to horizontal pressure plates are cut ¼” long, both ends
maximum.

D.)

Apply sealant to the face of the mullion plug prior to installing the vertical or
horizontal pressure plate.

Mull plug

Vertical Gasket

Preset gasket

Note: The vertical gasket runs through the joint

plug notch at the horizontal location. Seal
all corners of the gaskets with sealant.