Series 5900 Silicone Structural Glazed Curtain Wall Installation

7/16"

Section XIII: Exterior Cover Installation

Snap-On Exterior Covers

A.)

Set vertical covers as shown on “APPROVED” shop drawings.








B.)

Center the horizontal snap cover in the opening, align and

engage one side, then use a block and mallet to engage

the opposite side.

C.)

Gaps at the ends should be equalized

and are provided to allow installation,
thermal movement, and weepage.

D.)

Exterior horizontal covers are cut

D.L.O. – 1/16”.

E.)

The erector is to split the

difference on both ends.






A 1/16” X 5/16” roll pin at the center of the

cut length is recommended to prevent

slippage. The roll pin can be located at the

horizontal to eliminate exposure.

Vertical cover

Horizontal

cover

Equal space at both ends

of horizontal cover

Mallet or hammer

Approx. 12” long

wood block

Drill 5/16”
diameter weep

holes in the

horizontal covers

2” from each end.

Note: Care must be taken

to avoid damage to
the covers during
installation. Use a
nominal 12” long 2
X 4 and mallet or
hammer to seat the

cover.

Note: Horizontal covers 1” or

more in depth must be
mechanically attached,
similar to detail below.