Sill, Jambs, Side panels – Coral Industries Regal Swing Door/DPNL (1/4 Frameless) - 5FJ User Manual
Page 4
5FJ-P 8/08
Measure opening at threshold of shower and cut sill (A) to
that measurement. If necessary, file corner of sill to fit
contour of your unit.
Position sill on centerline of threshold with tall edge of sill
toward outside of shower. Tape sill to threshold with
masking tape to hold in place while positioning jambs.
Threshold
Centerline
Masking Tape
Sill
A
File sharp
corners as
necessary to
fit contour of
your unit
OUTSIDE OF SHOWER
1
Sill
(A)
Due to the manufacturing process, there may be
rack marks present at one end of your sill and
header. Sill and header must be trimmed to fit your
individual opening. When cutting sill and header,
make certain to trim off end with rack marks.
Place one jamb (B) on sill with short legs against wall. Align
jamb vertically on wall using a level and mark wall through
prepunched holes. If necessary, file back edge (short legs)
of jambs to fit contour of your unit. Remove jamb and drill
where marked using 1/8" drill bit. Repeat for remaining
jamb on opposite wall.
Reposition jambs and mount to wall using 8A x 1" pan
head screws (J).
Insert side panels into wall jambs with bottom of each
panel resting on sill. Only position side panels at this time.
Parts will be drilled and secured after door is in place and
adjustments have been made for proper alignment.
Sill
File to fit
contour of
your unit if
needed
Jamb
B
OUTSIDE OF
SHOWER
Level
8A x 1" Pan
Head Screw
J
OUTSIDE OF SHOWER
Side Panel
A
When anchors (L) are used, holes should be drilled
using 3/16" drill bit. (Use masonry bit for tile.)
2
Jambs
(B)
B
Jamb
Measure
OUTSIDE OF SHOWER
3
Side Panels