Back panel connections, Setting up the suretest torque calibration system – CDI Torque SURETEST Torque Calibration System User Manual
Page 26

SETUP AND PROGRAMMING
CHAPTER 3
3-25
Back panel connections
A
Manual
Loader
B
Solenoid control cable
C Suretest
D
Smart 4-in-1 transducer
E Transducer
cable
F
Smart single transducer
G Analog
Output
H
Foot cable switch
I
Power cables (110/220 VAC)
J Printer
cable
K
Personal computer cable
Note: Cable (K) can be connected to Printer Port too.
Setting Up the
SURETEST
Torque Calibration System
1.
Position the roll cabinet on a level floor and lock the wheels.
2.
Mount the indicator stand, part number 2000-111-0, to the Loader.
3.
Mount
the
SURETEST base uint to the stand.
4.
Connect the solenoid control cable between the Suretest and Loader.
5.
Install the appropriate SURETEST transducer to the Loader drive.
6.
Install two (2) quick release pins, part number 2000-195-12
7.
Connect the transducer cable, part number 2000-900-120, between the Indicator and
transducer.
8.
Select the appropriate AC voltage input at the rear of the Loader. Connect the AC power
cables to the Loader. For additional information refer to Chapter 6—Loader Rear Panel
Controls.
9.
Install the safety shield to the front of the Loader.
10.
Install the reaction pins into the reaction slide on the Loader.
11.
Install two Linear ball bearing, part number 2000-173-11.
For testing procedures refer to Chapter 4—Using the Torque Tester.