beautypg.com

Installation process caution – Tomei Powered ROCKER ARM STOPPERS User Manual

Page 5

background image

INSTALLATION PROCESS

CAUTION

■ Please clean the product thoroughly prior to installation.
■ Please do not bend/deform the product; this can cause interference with other components.
■ There are times when installation methods can vary, depending on models. For more detailed information, please

follow the Nissan workshop service manual for that car/engine type.

■ Check thoroughly to be sure that there are no signs of interference with the rocker (head) cover. This can cause

possible valve train damage and or oil leaks.

Torque Specs 1.2∼1.5kgm (11.8∼

(R)PS13 / HP10

S14 / S15

Rocker Cover

The inner divider plate on the inside of the
rocker (head) cover (in the area circled)
will have to be cut out to prevent
interference.

L=55mm (4pcs)

INTAKE Side

Stopper

Spacer

L=65mm (1pcs)

Oil Line

L=55mm (4pcs)

L=40mm (5pcs)

L=40mm (5pcs)

L=65mm (1pc)

Oil Line

Large hole (φ8.5mm) rear side

EXHAUST Side Stopper

Install the Camshaft Bolts

5

● Installation proceedure.

● Installation proceedure.

(1) ①→⑩→⑪→⑬→⑧ Bolt torque order

(1) Both Intake/Exhaust ⑨/ ⑩ @0.2kgm After

@ 0.5kgm

tightening ①∼⑧

(2) ①∼⑬ Bolt torque order @ 1.2∼1.5kgm

(2) Both Intake/Exhaust tighten in numerical

● Removal order is ⑬∼①.

sequence @ 0.5kgm

(3) Both Intake/Exhaust tighten in numerical

sequence @ 0.92∼1.2kgm

● Removal order is ⑩∼①.

FRONT SIDE

Spacer

Baffle Plate
※ Don't use.

Install the Camshaft Bolts

Torque Specs 0.92∼1.2kgm (9∼11.8Nm)

REMOVING THE ROCKER COVER

CAMSHAFT & BOLT INSTALLATION

FRONT SIDE

FRONT SIDE


5