beautypg.com

Cisco 3550 User Manual

Page 67

background image

C-3

Catalyst 3550 Multilayer Switch Hardware Installation Guide

OL-6155-01

Appendix C DC Power Connections

Connecting to DC Power

Step 4

Using a Panduit crimping tool, crimp the ground lug to the 6-gauge wire, as shown in

Figure C-2

.

Figure C-2

Crimping the Ground Lug

Step 5

Use the two number-10-32 screws to attach the ground lug and wire assembly to the switch rear panel
RPS connector, as shown in

Figure C-3

.

Step 6

Using a ratcheting torque screwdriver, torque each ground-lug screw to 15 lbf-in. (240 ozf-in.)

Figure C-3

Torquing Ground-Lug Screws

60529

CONSOLE

36 - 72V

1 - 0.5A

A

B

65804

Torque to 15 lbf-in.