beautypg.com

Site requirements, Verifying package contents – Cisco 3550 User Manual

Page 34

background image

2-4

Catalyst 3550 Switch Hardware Installation Guide

OL-6155-01

Chapter 2 Switch Installation

Preparing for Installation

Site Requirements

When determining where to place the switch, be sure to observe these requirements:

Operating environment is within the ranges listed in

Appendix A, “Technical Specifications.”

Clearance to front and rear panels is such that

Front-panel indicators can be easily read.

Access to ports is sufficient for unrestricted cabling.

Rear-panel power connector is within reach of an AC power receptacle.

Airflow around the switch and through the vents is unrestricted.

Temperature around the unit does not exceed 113° F (45° C).

Note

If the switch is installed in a closed or multirack assembly, the temperature around it might be greater
than normal room temperature.

Cabling is away from sources of electrical noise, such as radios, power lines, and fluorescent
lighting fixtures. Make sure that the cabling is safely away from other devices that might damage
the cables.

For sites requiring compliance to Telcordia GR-1089-CORE Intra-building Lightning requirements,
all 10/100 and 10/100/1000 ports must be connected with shielded cable grounded at both ends.

Verifying Package Contents

Note

Carefully remove the contents from the shipping container, and check each item for damage. If any item
is missing or damaged, contact your Cisco representative or reseller for support. Return all packing
material to the shipping container, and save it.

The switch is shipped with these items:

This Catalyst 3550 Series Hardware Installation Guide

Where to Find the Catalyst 3550 Documentation flyer

Product registration card

AC power cord (AC-powered switches)

One RJ-45-to-DB-9 adapter cable

Mounting kit containing:

Four rubber feet for mounting the switch on a table

Two 19-inch rack-mounting brackets

Four Phillips flat-head screws for attaching the brackets to the switch (Catalyst 3550-12T
and 3550-12G switches)

Six Phillips flat-head screws for attaching the brackets to the switch (Catalyst 3550-24,
3550-24-DC, 3550-24-FX, 3550-24PWR, and 3550-48 switches)

Four Phillips machine screws for attaching the brackets to a rack