Ames Fire & Waterworks 400B Bronze Reduced Pressure Zone Assemblies User Manual
Installation, maintenance, & repair series 400b
RP/IS-A-400B
400B
Installation, Maintenance, & Repair
Series 400B
Reduced Pressure Zone
Sizes:
3
⁄
4
" – 2" (20 – 50mm)
Testing
For field testing procedure, refer to Ames installation sheets
IS-A-ATG-1 found on
www.amesfirewater.com.
For other repair kits and service parts, refer to our Backflow
Prevention Products Repair Kits & Service Parts price list
PL-A-RP-BPD found on
www.amesfirewater.com.
For technical assistance, contact your local Ames representative.
WARNING
!
Read this Manual BEFORE using this equipment.
Failure to read and follow all safety and use information can
result in death, serious personal injury, property damage, or
damage to the equipment.
Keep this Manual for future reference.
You are required to consult the local building and plumbing
codes prior to installation. If the information in this manual
is not consistent with local building or plumbing codes,
the local codes should be followed. Inquire with governing
authorities for additional local requirements.
WARNING
!
Need for Periodic Inspection/Maintenance: This product must
be tested periodically in compliance with local codes, but at least
once per year or more as service conditions warrant. If installed on
a fire suppression system, all mechanical checks, such as alarms
and backflow preventers, should be flow tested and inspected in
accordance with NFPA 13 and/or NFPA 25. All products must be
retested once maintenance has been performed. Corrosive water
conditions, and/or unauthorized adjustments or repair could render
the product ineffective for the service intended. Regular checking
and cleaning of the product’s internal components helps assure
maximum life and proper product function.
WARNING
!
www.amesfirewater.com
A Watts Water Technologies Company