beautypg.com

9 testing – Trebor 55E EVOLVE User Manual

Page 23

background image

EVOLVE 55E PUMP OPERATION / MAINTENANCE MANUAL

PAGE 23

Hand-tighten all four of the quick grip nuts. Then use a wrench to turn the nuts 1½ to 2

more turns to fully seal the fitting.

Follow pump connection instructions above.

Figure 4-6: Port Location and Alignment of Pump Head

4.9 TESTING

4.9.a Performance Test

Connect the pump to a fluid and air supply. See above instructions.

With the air supply at 0 psi open the air supply valve

Increase the air pressure until the pump starts to cycle (Note: Pump cycling is controlled

by the external control system. The pump will not operate without an operating external
controller.)