tekmar 654 Snow Melting Control Quick Start User Manual
Quick setup guide 1, Location, Remove mounting base

© 2014
654_Q - 02/14
1
A Watts Water Technologies Company
654_Q
02/14
Replaces: 01/14
Snow Melting
Snow Melting Control 654
Quick Setup Guide
1.
Location
2.
Remove Mounting Base
3.
Install Mounting Base
3
1
/
4
”
(83 mm)
Base
Stud
Gang
Box
Wall
Stud
Base
Interior
Wall
5 feet
1.5 m
Exterior
Wall
Behind
Door
4.
Switch Settings
Back of
Control
LOCK ACCESS LEVEL
The control is locally locked and the access level cannot be changed. Set to Lock
when installation has been completed.
UNLOCK ACCESS LEVEL
The control is unlocked and the access level may be changed. Go to the Toolbox
menu to change the access level. Set to Unlock during the installation process.
1058-01
Switch
Se
ttings
Lock
Unused
Unlock
ON
1 2
or
See also other documents in the category tekmar Sensors:
- 032 Timer (4 pages)
- 033 4 Timer (12 pages)
- 040 RDM (4 pages)
- 054 RTU (2 pages)
- 055 RTU (2 pages)
- 060 RTU (2 pages)
- 062 RTU (4 pages)
- 063 RTU (8 pages)
- 070 Outdoor Sensor (4 pages)
- 071 Universal Sensor (4 pages)
- 072 10k Slab Sensor (2 pages)
- 073 10k Slab Sensor (2 pages)
- 076 Indoor Sensor (4 pages)
- 077 Indoor Sensor (4 pages)
- 078 Universal Sensor (4 pages)
- 079 Slab Sensor (4 pages)
- 081 Three Outdoor Sensor Module (4 pages)
- 082 Universal Sensor (4 pages)
- 083 Duct Sensor (4 pages)
- 084 Indoor Sensor (4 pages)
- 085 10k Solar Sensor (2 pages)
- 086 Humidity & Temperature Sensor (8 pages)
- 090 Snow/Ice Sensor (8 pages)
- 095 Snow Sensor (8 pages)
- 150 One Stage Setpoint Control (4 pages)
- 152 Two Stage Setpoint Control (4 pages)
- 153 Mixing Setpoint Control (4 pages)
- 155 Difference Setpoint Control (4 pages)
- 156 Difference Setpoint Control (12 pages)
- 157 Difference Setpoint Control (16 pages)
- 161 Setpoint Control Installation (36 pages)
- 161 Setpoint Control User Manuals (12 pages)
- 162 Setpoint Control Installation (32 pages)
- 162 Setpoint Control User Manuals (12 pages)
- 256 Boiler Control (20 pages)
- 257 DHW Control (12 pages)
- 260 Boiler Control (20 pages)
- 261 Boiler Control (20 pages)
- 262 Boiler Control Installation (36 pages)
- 262 Boiler Control User Manuals (4 pages)
- 263 Boiler Control (36 pages)
- 264 Boiler Control (32 pages)
- 265 Boiler Control (36 pages)
- 268 Boiler Control (32 pages)
- 269 One Stage Steam Control (12 pages)