beautypg.com

Bryant Deluxe 4-Way Multipoise Variable-Capacity Direct-Vent Condensing Gas 355MAV User Manual

Page 20

background image

II.

24-V WIRING

Make field 24-v thermostat connections at 24-v terminal block on
furnace control. Y wire from thermostat MUST be connected to
Y/Y2 terminal on furnace control, as shown in Fig. 28, for proper

cooling operation. The 24-v terminal block is marked for easy
connection of field wiring. (See Fig. 32.) The 24-v circuit contains
a 3-amp, automotive-type fuse located on furnace control. (See
Fig. 32.) Any electrical shorts of 24-v wiring during installation,
service, or maintenance may cause fuse to blow. If fuse replace-
ment is required, use only a fuse of identical size (3 amp) and type.
The furnace control will flash status code 24 when fuse needs
replacement.

NOTE:

Use AWG No. 18 color-coded copper thermostat wire for

lengths up to 100 ft. For wire lengths over 100 ft, use AWG No.
16 wire.

NOTE:

For additional thermostat connection diagrams, reference

Fig. 50-57.

III.

ACCESSORIES

1. Electronic Air Cleaner (EAC)

The furnace control EAC terminals are energized with 115v
(1.0-amp maximum) during blower operation.
Connect an accessory Electronic Air Cleaner (if used) using
1/4-in. female quick connect terminals to the two male
1/4-in. quick-connect terminals on the control board marked
EAC-1 and EAC-2. The terminals are rated for 115VAC,
1.0 amps maximum and are energized during blower motor
operation. (See Fig. 32.)

TABLE 4—ELECTRICAL DATA

UNIT

SIZE

VOLTS—
HERTZ—

PHASE

OPERATING

VOLTAGE RANGE

MAXIMUM

UNIT

AMPS

MINIMUM

WIRE

SIZE

MAXIMUM WIRE

LENGTH (FT)‡

MAXIMUM FUSE OR

CKT BKR AMPS**

Maximum*

Minimum*

042040

115—60—1

127

104

8.9

14

31

15

042060

115—60—1

127

104

8.9

14

31

15

042080

115—60—1

127

104

8.9

14

31

15

060080

115—60—1

127

104

13.8

12

32

20

060100

115—60—1

127

104

13.8

12

32

20

060120

115—60—1

127

104

13.8

12

32

20

* Permissible limits of voltage range at which unit will operate satisfactorily.
† Unit ampacity = 125 percent of largest operating component’s full load amps plus 100 percent of all other potential operating components’ (EAC, humidifier, etc.) full load

amps.

‡ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.
** Time-delay type is recommended.

Fig. 28—Heating and Cooling Application Wiring Diagram

A98325

115-V

FIELD-SUPPLIED

DISCONNECT

SWITCH

115-V

SINGLE

PHASE

AUXILIARY
J-BOX

FURNACE

CONTROL

CENTER

TWO WIRE

24-V

TERMINAL

BLOCK

THREE-WIRE

HEATING

ONLY

FIVE

WIRE

NOTE 5

NOTE 1

NOTE

3

THERMOSTAT
TERMINALS

FIELD-SUPPLIED

DISCONNECT

CONDENSING

UNIT

R

W2

W

C

R

G

Y

GND

GND

GND

GND

FIELD 24-V WIRING
FIELD 115-, 208/230-, 460-V WIRING
FACTORY 24-V WIRING
FACTORY 115-, 208/230-, 460-V WIRING

208/230- OR

460-V

THREE PHASE

208/230-V

SINGLE

PHASE

W/W1

Y/Y2

G

C

NOTES:

1.
2.
3.
4.

5.

Connect Y or Y/Y2 terminal as shown for proper cooling operation.
Proper polarity must be maintained for 115-v wiring.
Use W2 with 2-stage thermostat when zoning.
If any of the original wire, as supplied, must be replaced, use
same type or equivalent wire.
Some thermostats require a "C" terminal connection as shown.

CAUTION:

Do not connect aluminum wire between

disconnect switch and furnace. Use only copper wire.
(See Fig. 29.)

A93033

Fig. 29—Disconnect Switch and Furnace

COPPER

WIRE ONLY

ELECTRIC

DISCONNECT

SWITCH

ALUMINUM

WIRE

—20—