beautypg.com

3 installation diagram, Installation diagram – Metrohm 850 Professional IC Cation - LP-Gradient User Manual

Page 25

background image

■■■■■■■■■■■■■■■■■■■■■■

3 Installation

850 Professional IC Cation – LP Gradient

■■■■■■■■

15

9 Conditioning the instrument

See Chapter 4.2, Page 56

The instrument is now ready for measuring samples.

3.3

Installation diagram

Figure 3 Installation diagram shows the necessary capillary connections
for an application of a low pressure gradient with three solutions.

The arrangement of the modules in the diagram corresponds to the front
view of the instrument. Liquid containers (eluent bottle, sample vessel,
waste container, auxiliary solutions container) and guard column are not
shown in the diagram.

Most of the capillaries are already pre-installed at the time the instrument
is delivered. Capillaries on which nothing needs to be done at the time of
initial installation are not numbered in the diagram.