I/port installation, Caution statements, Setup – ClearCube I/Port Quick Reference Guide User Manual
Page 15: Orientation and venting, Power sources

ClearCube I/Port User’s Guide, Rev. C
I/Port Installation • 11
I/Port Installation
Caution Statements
Improper connection, mounting, or use of this product could result in component
failure or undesired interference. Read the following caution statements before setting
up and operating your I/Port.
Setup
•
Do not connect to AC power until all other connections are made, including the
power adapter. Connecting or disconnecting components or equipment on the
back panel when the I/Port is receiving AC power can cause power surges and
damage the device.
•
Do not force a connector into its socket. If any undue resistance is encountered,
ensure that the connector is correctly oriented to the receptacle.
•
Do not attach the I/Port to a telephone jack or other powered network connection.
This will permanently damage the I/Port. This damage is not covered under the
ClearCube Technology limited warranty.
Orientation and Venting
•
Allow sufficient space around the I/Port for ventilation. Do not place the device in
any enclosure that restricts airflow around the device. Do not place any objects on
the device. Product environmental specifications are listed on page 29.
•
Mount the Eon e100 I/Port only vertically. Improper orientation could inhibit the
dissipation of heat from the device and damage it.
•
The I8020 and I8820 can be mounted horizontally or vertically. An optional
mounting bracket is available from ClearCube. Provide adequate clearance
around the I/Port for cooling.
•
The I8330 can be mounted horizontally or vertically. Provide adequate clearance
around the I/Port for cooling.
Power Sources
•
To ensure regulatory compliance, use only the power supply included in the
shipping carton with the I/Port, or a ClearCube-approved equivalent.
•
Surge protectors for electrical devices are recommended in areas of frequent
lightning. However, when lightning is occurring, your equipment should be
properly shut down and unplugged from AC power until the storm has passed.
•
Be careful to not interrupt power while the I/Port is receiving a software update.