beautypg.com

Rockwell Automation 2100 Installing Ground Bus and Connectors User Manual

Centerline

background image

1

Publication 2100-IN031B-EN-P - March 2003

Instructions

CENTERLINE

®

Motor Control Centers

Installing A Vertical Unit Load Ground Bus
and Connectors in Bulletin 2100 Sections

Catalog Numbers 2100H-N79L, 2100H-N79LT and
Unit Options -79L, -79LT

Applications

Use this publication for installing a vertical unit load ground bus and/or unit
load ground connectors in Bulletin 2100 Motor Control Center (MCC)
sections, with series letters “E” or later. This kit is designed specifically for
standard sections, with six space factors of plug-in units. The vertical unit load
ground bus (referred to as “vertical bus” after this) will have to be shortened
for sections with factory-mounted equipment. Contact your local
Allen-Bradley sales office or distributor for instructions on how to shorten,
install and cable the vertical bus in sections with factory-mounted equipment.

Recommended Tools

• Screwdriver
• 3/8”, 7/16” wrench or socket (hex-type suggested)
• Torque wrench

ATTENTION

!

WARNING: Disconnect or interrupt all sources of power
to the Motor Control Center before proceeding. Serious
injury or death can result from working on energized
sections.