beautypg.com

Applying power, Chapter – Rockwell Automation 1608P ProDySC Installation Instructions, 25 and 50 A User Manual

Page 17

background image

Rockwell Automation Publication 1608P-IN001B-EN-P - May 2014

17

Chapter

4

Applying Power

Verify that the ProDySC voltage rating matches the source voltage.

Before applying power to the ProDySC, make certain there are no metal
filings or any conductive debris in or on any components inside the
ProDySC.

Ensure that all input/output wiring including grounding has been
completed and that all access doors are closed.

Place the maintenance bypass in “Bypass” mode.

Apply power from the upstream branch protection device. Power will flow
through the maintenance bypass directly to the load.

Place the maintenance bypass in “Test” mode. The ProDySC touchscreen
will become active but the load will still be powered through the bypass.

Ensure that the touchscreen displays “OK” in the upper left corner and
that the nominal voltage, current, and frequency in the status display are
correct

If a “Critical” or “Fatal” system event appears on the touch screen (1) place
the maintenance bypass switch in BYPASS and (2) call for technical
support

Place the maintenance bypass in “Normal” mode.

Verify that the output (load) voltage is present and within its nominal
rating.

If a “Critical” or “Fatal” system event appears on the touch screen (1) place
the maintenance bypass switch in BYPASS and (2) call for technical
support.

ATTENTION: For Information regarding the operation of ProDySC, including information on
the display screen and maintenance, see Publication 1608P-UM001_-EN-P.