Installation, Canopies – USG Translucents Canopies User Manual
Page 9
8 T
ranslucenTs
™
Canopies
Installation
Canopies
Figure 2
Unscrew the structure attachment clip and line up the center hole with the wire location mark, transfer each of
the three screw holes to the mounting surface. Reassemble the structure attachment clip.
Each panel will have 4 predrilled holes that will be used with the provided panel attachments plates.
Layout marks should be made on the floor corresponding to each panel hole.
– For installation of the
Valley
or
Vault panel in a horizontal orientation (where the ends of the panels are
level with each other) the hanger points are 13-1/2 by 34-1/2 inches apart.
– For installation of the
Wave
panel in a horizontal orientation (where the ends of the panels are level
with each other) the hanger points are 13-1/2 by 32-1/2 inches apart.
– For non-horizontal or multiple panel install see pages 12 and 13. Take measurements of these holes
and transfer them to the floor in the area the Wave is to be hung.
Figure 1
Using a laser plumb-bob, transfer wire location
marks from the floor to the building structure or
ceiling deck. If the ceiling is hanging below an
existing drop ceiling, the wire must pass through
and attach to the building structure. A decorative
escutcheon is available as an accessory. (TRNCBLESC)