beautypg.com

Installation, Canopies – USG Translucents Canopies User Manual

Page 9

background image

8 T

ranslucenTs

Canopies

Installation

Canopies

Figure 2

Unscrew the structure attachment clip and line up the center hole with the wire location mark, transfer each of
the three screw holes to the mounting surface. Reassemble the structure attachment clip.

Each panel will have 4 predrilled holes that will be used with the provided panel attachments plates.

Layout marks should be made on the floor corresponding to each panel hole.

– For installation of the

Valley

or

Vault panel in a horizontal orientation (where the ends of the panels are

level with each other) the hanger points are 13-1/2 by 34-1/2 inches apart.

– For installation of the

Wave

panel in a horizontal orientation (where the ends of the panels are level

with each other) the hanger points are 13-1/2 by 32-1/2 inches apart.

– For non-horizontal or multiple panel install see pages 12 and 13. Take measurements of these holes

and transfer them to the floor in the area the Wave is to be hung.

Figure 1

Using a laser plumb-bob, transfer wire location
marks from the floor to the building structure or
ceiling deck. If the ceiling is hanging below an
existing drop ceiling, the wire must pass through
and attach to the building structure. A decorative
escutcheon is available as an accessory. (TRNCBLESC)