beautypg.com

Handling – USG Fiberock Underlayment and Tile Backerboard User Manual

Page 4

background image

Wall Applications:

Maximum

stud spacing: 16" o.c.
Framing shall be designed
(based on stud properties
alone) not to exceed L/360
deflection for tile, L/240 for
surfaces that will be painted.
Maximum fastener spacing:
8" o.c. for wood and steel
framing; 6" o.c. for ceiling
applications.

Patching Compound

Use a high-quality patching

compound such as D

urock

Floor Patch or equivalent
approved by the resilient-
flooring manufacturer.

Adhesive/Mortar

Meeting ANSI A136.1: Type I

ceramic tile adhesive.

Meeting ANSI A118.1: dry-set

mortar.

Meeting ANSI A118.4: latex

portland cement mortar.

Grout

meeting ANSI A118.7.

Ceramic tile

meeting ANSI

A137.1.

Waterproof Membrane

If waterproofing is desired,

use D

urock

tile membrane

installed with D

urock

tile

membrane adhesive. See USG
literature piece CB492 for
D

urock

tile membrane product

information.

– Protect panels from the

elements with adequate
covering during delivery and
storage.

– Store panels flat on an even,

dry surface. Allow panels to
acclimate to temperature and
humidity at job site prior to
installation.

– Handle panels in an upright

position to prevent breakage.

Incorrect

1607002 FB-102

Correct

Incorrect

Handling

4