Surface mounted installation instructions

background image

Large Commercial Signage – 1510/1520 Series

Surface Mounted Installation Instructions


Thank you for selecting Salsbury Industries’ 1510 or 1520 series large commercial surface mounted signage. We are confident that the quality of the

signage will prove to be a good investment. These instructions are intended to assist you in a typical installation.


Installation

The back of the signage has two (2) brackets with hooks at the upper

end to enable hanging the signage on the mating slotted bracket

installed on the wall mounting surface. The wall brackets are
positioned such that the brackets and mounting screws will not be

visible. The installation fasteners are not provided due to the

variation in wall types. Choose fasteners and anchors appropriate

for the type of wall and weight of the signage. Eight (8) of each are
required.

Determine the location for the signage on the wall surface. -The wall

brackets should be installed with the slotted bracket being above the

lower clamping bracket as shown in the illustration.

The vertical distance between the mounting holes for the two (2)

brackets is 1’-2” (14”). Measure this dimension carefully and use a

spirit level for leveling. If the wall brackets are not installed

horizontally and at the correct separation distance, the mating
brackets on the signage may not mate correctly and securely to the

wall brackets.

The horizontal distance between mounting holes should be

transferred to the wall from the two (2) wall brackets. Install the

brackets with the appropriate anchors and screws.

Back the clamping screws out most of the way in the bottom flanges

of the two (2) signage brackets.

Hang the signage on the wall brackets, ensuring that both of the

hooks on the signage brackets are securely engaged in the slots on
the upper wall bracket. To facilitate proper engagement, tilt the

bottom edge of the signage away from the wall while engaging the

upper hooks. Once the upper hooks are engaged, pivot the signage

bottom edge back against the wall.

The ends of the two (2) clamping screws should be below the flange

of the lower wall bracket. Note that this flange angles downward.

Adjust the two (2) clamping screws upward until their ends have

engaged and tightened against the flange of the lower wall bracket.
Ensure that these screws are securely clamped. Installation is now

complete.

Cleaning

Using a soft cloth or sponge, clean the signage with liquid soap,

detergent, or diluted water-soluble household cleaners. Completely

remove residue of any cleaning products with water and dry with a
clean cloth. Do not use abrasive cleaners on the signage

Large Commercial Signage – Rectangular/Arched Designs

SALSBURY INDUSTRIES

1010 East 62

nd

Street, Los Angeles, CA 90001-1598

Phone: 1-800-624-5269 Int’l Phone: 323-846-6700

Fax: 1-800-624-5299 Int’l Fax: 323-846-6800

www.mailboxes.com engineering

@

mailboxes.com

Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.

Copyright © 2010 Salsbury Industries. All rights reserved. (Rev. 03, 2/17/2010)

This manual is related to the following products: