Salsbury Industries S-62000 Series See Through Lockers Double Tier User Manual
Double tier installation instructions, Salsbury industries
See Through Lockers – S-62000 Series
Double Tier Installation Instructions
Phone: 1-800-562-5377
Int’l Phone: 323-846-6700
Fax: 1-800-562-5399
Int’l Fax: 323-846-6800
www.lockers.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2014 Salsbury Industries. All rights reserved. Page 1 of 5 3/27/14
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Thank you for selecting Salsbury’s see through double tier lockers. These instructions are intended to assist you in assembling the lockers. Assembly of the various locker components
will be with #10 - 24 x 3/8” long slot less screws and #10 nuts (provided). Loosely fasten a screw and a nut into every set of mating holes with the screw heads positioned on the outside
of the locker or on the exposed surface.
One Wide Locker Assembly
Step 1: Attach the top shelf, bottom shelf, and two single coat hooks to the back
panel.
Step 2: Turn the back panel on its back with the shelves pointing upward. Attach the
first side panel, the left rear leg, and one compartment divider to the assembly from
Step 1. Attach an additional two single coat hooks to the first side panel and a double
coat hook to the bottom of the top shelf and a second double coat hook to the bottom
of the compartment divider.
Step 3: Attach the second side panel and the right rear leg to the assembly of Step 2.
Attach an additional two single coat hooks to the second side panel. The locker
chassis is now complete.
Step 4: Attach the pre-assembled door frame onto the assembly of Step 3.
Step 5: Tighten all fasteners checking for squareness of the locker while tightening.
Attach optional sloping hood, end bases or front base (see pages 4 and 5).
Step 6: Place the locker in the installed location and anchor to the floor, wall, or to
both. Individual job conditions will dictate the type of fastening anchors to use (not
provided).
Step 7: Fasten all lockers in a row together by installing fasteners provided through
the side panels. Installation is now complete.