Salsbury Industries 19900 Free-Standing Enclosures For 19000/19100 Series Recessed Mounted Cell Phone Lockers User Manual
Salsbury industries, Installing free-standing enclosure to floor, Installing enclosure front panel
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-624-
5269 Int’l Phone: 323-846-6700
Fax: 1-800-624-5299
Int’l Fax: 323-846-6800
www.mailboxes.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2013 Salsbury Industries. All rights reserved. (Rev. 02, 9/16/2013) Page 1 of 2
19900 Free-Standing Enclosures
For 19000/19100 Series Recessed Mounted Cell Phone Lockers
Installation Instructions
Installation of the free-standing enclosure requires first installing the enclosure to its mounting surface, then installing the enclosure front panel to the
enclosure and lastly installing the recessed cell phone locker into the enclosure.
Installing Free-Standing Enclosure to Floor
Place the enclosure onto the selected location. Mark the fastener
locations on the mounting surface by transferring the four (4) large
holes locations in the bottom side flanges to the mounting surface.
Remove the enclosure and make the holes for the installation
fasteners. Install the fasteners (not provided). Return the enclosure
to the selected location. Complete the installation of the fasteners.
The use of leveling nuts on stud anchors is suggested.
Installing Enclosure Front Panel
Install the front panel to the enclosure using #10 x 1/2 in. long screws
(provided). Attach it to the enclosure along the two sides and the
bottom.