Salsbury Industries S-66000 Series See Through Box Style Bridge Lockers User Manual
Installation instructions, Salsbury industries, Typical assembly of end units
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-562-5377 Int’l Phone: 323-846-6700
Fax: 1-800-562-5399 Int’l Fax: 323-846-6800
www.lockers.com engineering
@
lockers.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2012 Salsbury Industries. All rights reserved. 2/8/2012
See-Through Box Style Bridge Lockers S-66000 Series
Installation
Instructions
Thank you for selecting Salsbury’s see-through box style bridge lockers. We are confident that the quality and construction of the lockers will prove
to be a good investment. These instructions are intended to assist you in a typical anchored locker installation. Individual job conditions will dictate
the type of anchor fasteners and whether the lockers must be anchored to the wall, the floor, or both.
Typical Assembly of End Units
Notes
When lockers are set in place, care must be taken to assure lockers
are set plumb and true before anchoring.
Lockers are not designed as freestanding structures. Lockers must
be anchored securely to walls and/or floors with fasteners. The
anchoring fasteners are not provided. Choose appropriate hardware
for the installation conditions. WARNING: Failure to properly
anchor lockers could cause them to topple.
Adjust all doors to operate freely if required.
If built-in locks are installed, make certain locks operate properly
before closing doors.
Assembly of See-Through Box Style Bridge Locker End
Units
Lay down the back panel with the flanges facing up and the two
closer leg mounting holes at the bottom. Loosely attach the leg to
the inside of the back panel flange, with the wider leg flange against
the back of the back panel, using two bolts and nuts. Loosely attach
the second leg to the opposite side of the back panel in the same
manner.
Attach one side panel to the outside of the flange of the back panel.
The back panel flange should be between the side panel and the leg
installed in the paragraph above. Align the holes and secure with
bolts and nuts.
Bolt the top and the bottom to the side panel. Make certain that their
fronts are in the correct position. Secure the second side panel to
the unit. Bolt the shelves to the sides.
Place the doorframe over the assembled locker and fasten. Make
certain that the sides are inside the doorframe.
Carefully raise the locker to an upright position. Square and level the
cabinet, then tighten all nuts and bolts.