Single tier installation instructions, Salsbury industries – Salsbury Industries S-61000 Series See Through Lockers Single Tier User Manual
Page 3
See Through Lockers – S-61000 Series
Single Tier Installation Instructions
Phone: 1-800-562-5377
Int’l Phone: 323-846-6700
Fax: 1-800-562-5399
Int’l Fax: 323-846-6800
www.lockers.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2014 Salsbury Industries. All rights reserved. Page 3 of 5 3/27/14
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Three Wide Locker Assembly (continued)
Step 7: Attach the last side panel and the right rear leg to the assembly of Step 6. On
12” and 15” deep lockers attach the last single coat hook. On 18” deep lockers
substitute the last single coat hook with a double bend instead of the last single coat
hook and install the last coat rod. The locker chassis is now complete.
Step 8: Position the pre-assembled door frames onto the assembly of Step 7 then
fasten one by one.
Step 9: Tighten all fasteners checking for squareness of the locker while tightening.
Attach optional sloping hoods, end bases or front bases (see pages 4 and 5).
Step 10: Place the locker in the installed location and anchor to the floor, wall, or to
both. Individual job conditions will dictate the type of fastening anchors to use (not
provided).
Step 11: Fasten all lockers in a row together by installing fasteners (provided) through
the side panels. Installation is now complete.
Coat Rod Installation – 18” Deep Single Tier Locker Only