CHECKLIST — INSTALLATION

LOAD CALCULATION

________________

Heating Load (Btuh)

Condensate Drain

________________

Cooling Load (Btuh)

________________

Unit Level or Pitched Forward

________________

Furnace Model Selection

________________

Internal Tubing Connections

Free of Kinks and Traps

COMBUSTION AND VENT PIPING

________________

External Drain Connection Leak

Tight and Sloped

Termination Location

________________

Condensate Trap Primed before

Start---Up

________________

Vent

Heat Tape Installed if Required

________________

Roof

CHECKLIST --- START---UP

________________

Sidewall

________________

Gas Input Rate (Set Within 2

percent of Rating Plate)

________________

Combustion---Air

________________

Temperature Rise Adjusted

________________

Roof

Thermostat Anticipator

________________

Sidewall

________________

Anticipator Setting Adjusted or

________________

Attic

________________

Cycle Rate (3 Cycles per Hr)

Selected

________________

Crawl Space

Safety Controls Check Operation

________________

Termination Kit---2 Pipe or

Concentric

CHECKLIST --- START---UP

________________

Combustion---Air Pipe Length

________________

Gas Input Rate (Set Within 2

percent of Rating Plate)

________________

Combustion---Air Pipe Elbow

Quantity

________________

Temperature Rise Adjusted

________________

Vent Pipe Length

Thermostat Anticipator

________________

Vent Pipe Elbow Quantity

________________

Anticipator Setting Adjusted or

________________

Pipe Diameter Determined from

Sizing Table

________________

Cycle Rate (3 Cycles per Hr)

Selected

________________

Pipe Sloped To Furnace

Safety Controls Check Operation

Pipe Insulation

________________

Primary Limit

________________

Over Ceilings

________________

Pressure Switches

________________

Low---Ambient Exposed Pipes

355C

A