33

At least 36 in.

18 in. maximum

Vertical separation
between combustion
air and vent

8 3/4 in. (222mm)for 3 in. (76mm)ki t

6 3/4 in. (172mm)for 2 in. (51mm) ki t

Roof Te rmination (Preferred)

Abandoned masonry
used as raceway
(per code)

At least

36 in.

A

Maintain 12

in.

min. clearance above
highest anticipated
snow level, maximum of
24 in. above roof

Concentric Vent and Combustion Air
Roof Termination (preferred)

1

in.

(25mm)

maximum (typ) from wall to inlet

12

in. (305mm)

minimum from

overhang or roof

Maintain 12

in.

min. clearance above
highest anticipated
snow level or grade
whichever is greater

A

At le

ast

36

in

.

Concentric Vent
and Combustion - Air
Side Te rmination

A

At least 36 in.

Side wall termination

of less than 12

in. (305mm)

above highest snow level

12

in.

min from

overhang or roof

12

in.

(305mm)

separation between
bottom ofcombustion air and
bottom of vent (typ)

Maintain 12

in.

min. clearance above
highest anticipated
snow level or grade
whichever is greater (typ)

A

At least

36 in

.

A

Maintain 12 in. (305mm)min

.

clearance above
highest anticipated
snow level
Maximum of 24 in.(614mm)
above roof

90

°

Note: "A" denotes 0 to < 2 in.
Between the first 2 vents
Third vent must be > 36 in. away

(typ)

(914mm

)

(305mm)

(914mm)

(305mm)

(305mm)

(914mm)

(914mm)

(457mm)

(51mm)

(914mm)

A05090

Fig. 36 -- Combustion Air and Vent Termination for Direct Vent (2--pipe) System

Abandoned masonry
used as raceway
(per code)

12 in. (305 mm) min. from

overhang or roof

Maintain 12 in. (305mm)
minimum clearance
above highest anticipated
snow level or grade
whichever is greater.

Side wall termination
with 2 elbows (preferred)

12 in. min. (305 mm)from

overhang or roof

Maintain 12 in. (305mm)
minimum clearance
above highest anticipated
snow level or grade
whichever is greater

6 in. (152mm) minimum clearance

between wall and end of vent pipe.

10 in. (254mm) maximum pipe length

Sidewall Termination

with Straight Pipe (preferred)

Roof Termination (Preferred)

Vent

Maintain 12 in

.

minimum clearance

above highest anticipated

snow level maximum of

24 in. (610mm) above roof

.

90

°

(305mm)

A05091

Fig. 37 -- Vent Pipe Termination for Ventilated Combustion Air System

355C

A