Operating the machine, 6 explanations of the grinding cycles – Retsch Cryomill User Manual
Page 37
Operating the machine
37
Note the positioning of the Eppendorf reaction vials. If you are using two or four
reaction vials, these must be inserted in opposite openings.
Fig. 29: Position of 2 ml reaction vials
Pos : 6. 28 /00005 Ü berschrif ten/ 1. 1 Ü bersc hrift en/ 1. 1 Übersc hrift en BD A/ 11 Erl äut er ungen zu den Mahlz ykl en @ 0\ mod_1227686930552_9. doc @ 4010 @ @ 1
5.6 Explanations of the grinding cycles
Pos : 6. 29 /00010 Bedi enungsanleit ung en Kapitels ammlungen/Cr yoMill II /0007 Bedi enung/0009 Cr yoMill II Modul Erl äut er ungen zu d en Mahlz ykl en @ 5\ mod_1343829242206_9. doc @ 33235 @ 33 @ 1
You can deploy the CryoMill for grinding with cooling or grinding without cooling.
5.6.1
Grinding without cooling
•
Switch the CryoMill on at the main switch.
•
Set the cryo cycles to - .
•
Set the desired grinding time (B9)+(B11).
•
Press the START button.
The START LED lights up. The remaining grinding time and the set frequency are
displayed.
5.6.2
Grinding with cooling
The following program points can be set when grinding with cooling.
–
precooling (Vkz)
–
grinding time (Mz)
–
intermediate cooling time (Zkz)
–
cryo cycles (Number of cooling/grinding cycles)
–
frequency 1/s (Grinding frequency)
A single grinding cycle consists of the precooling and the set grinding time. The
intermediate cooling time does not apply in the case of a single grinding cycle.