Transport, scope of delivery, installation – Retsch Cryomill User Manual
Page 17
![background image](/manuals/571061/17/background.png)
Transport, scope of delivery, installation
17
The transport lock (TS), which is labelled with an arrow, is situated on the
underneath of the device.
Fig. 5: Removing the transport lock
•
Loosen and remove the screw (TS).
•
Unscrew the two screws (TC) and (TD).
•
Remove the transport bracket (TL2).
Fig. 6:
•
Re-insert the condensation collecting filter (R).
NOTICE
Keep the transport brackets, screws and transport lock for future transport!
Pos : 5. 23 /00010 Bedi enungsanleit ung en Kapitels ammlungen/Cr yoMill II /0006 Tr ansport, Li ef erumf ang und Aufs tell en / 0021 Cr yoMi ll II M odul Griffleis te @ 5\ mod_1355217974441_9. doc @ 36970 @ @ 1
TS
TC
TD
TL2
See also other documents in the category Retsch Equipment:
- BB 50 (41 pages)
- BB 100 (24 pages)
- BB 200 (24 pages)
- BB 300 (24 pages)
- CryoMill Autofill 50l (28 pages)
- DM 200 (20 pages)
- DM 400 (60 pages)
- Emax (67 pages)
- GM 200 (44 pages)
- GM 300 (44 pages)
- MM 200 (32 pages)
- MM 400 (32 pages)
- PM 100 (44 pages)
- PM 400 (36 pages)
- PM GrindControl (48 pages)
- RM 200 (36 pages)
- RS 200 (32 pages)
- SK 100 (24 pages)
- SM 100 (48 pages)
- SM 200 (48 pages)
- SM 300 (44 pages)
- Cyclone - SM 300 (20 pages)
- SR 200 (24 pages)
- SR 300 (24 pages)
- TWISTER (44 pages)
- ZM 200 (32 pages)
- AS 200 jet - Automatic Vacuum Regulation (6 pages)
- AS 200 control - natural frequency (32 pages)
- AS 200 (36 pages)
- AS 200 jet (56 pages)
- AS 200 jet (48 pages)
- AS 200 tap 30.025.0001 (28 pages)
- AS 200 tap 30.025.1001 (28 pages)
- AS 300 (32 pages)
- AS 400 (32 pages)
- AS 400 (28 pages)
- AS 450 basic (40 pages)
- AS 450 basic (44 pages)
- AS 450 control (52 pages)
- DR 100 (40 pages)
- DR 100 (28 pages)
- PP 25 (32 pages)
- PP 40 (28 pages)
- PT 100 (36 pages)