Transport, scope of delivery, installation – Retsch Cryomill User Manual
Page 17

Transport, scope of delivery, installation
17
The transport lock (TS), which is labelled with an arrow, is situated on the
underneath of the device.
Fig. 5: Removing the transport lock
•
Loosen and remove the screw (TS).
•
Unscrew the two screws (TC) and (TD).
•
Remove the transport bracket (TL2).
Fig. 6:
•
Re-insert the condensation collecting filter (R).
NOTICE
Keep the transport brackets, screws and transport lock for future transport!
Pos : 5. 23 /00010 Bedi enungsanleit ung en Kapitels ammlungen/Cr yoMill II /0006 Tr ansport, Li ef erumf ang und Aufs tell en / 0021 Cr yoMi ll II M odul Griffleis te @ 5\ mod_1355217974441_9. doc @ 36970 @ @ 1
TS
TC
TD
TL2
See also other documents in the category Retsch Equipment:
- BB 50 (41 pages)
- BB 100 (24 pages)
- BB 200 (24 pages)
- BB 300 (24 pages)
- CryoMill Autofill 50l (28 pages)
- DM 200 (20 pages)
- DM 400 (60 pages)
- Emax (67 pages)
- GM 200 (44 pages)
- GM 300 (44 pages)
- MM 200 (32 pages)
- MM 400 (32 pages)
- PM 100 (44 pages)
- PM 400 (36 pages)
- PM GrindControl (48 pages)
- RM 200 (36 pages)
- RS 200 (32 pages)
- SK 100 (24 pages)
- SM 100 (48 pages)
- SM 200 (48 pages)
- SM 300 (44 pages)
- Cyclone - SM 300 (20 pages)
- SR 200 (24 pages)
- SR 300 (24 pages)
- TWISTER (44 pages)
- ZM 200 (32 pages)
- AS 200 jet - Automatic Vacuum Regulation (6 pages)
- AS 200 control - natural frequency (32 pages)
- AS 200 (36 pages)
- AS 200 jet (56 pages)
- AS 200 jet (48 pages)
- AS 200 tap 30.025.0001 (28 pages)
- AS 200 tap 30.025.1001 (28 pages)
- AS 300 (32 pages)
- AS 400 (32 pages)
- AS 400 (28 pages)
- AS 450 basic (40 pages)
- AS 450 basic (44 pages)
- AS 450 control (52 pages)
- DR 100 (40 pages)
- DR 100 (28 pages)
- PP 25 (32 pages)
- PP 40 (28 pages)
- PT 100 (36 pages)